Transportation, decomposition and installation of landscape boulders

February 15, 2023

Pay attention to the connection of the main links during the processing of landscape boulders, so as to improve work efficiency and shorten the construction period, and ensure the orderly progress of the entire landscape boulders project.

Stone Carving Medium Pumpkin Pot

Due to the huge volume of large-scale landscape landscape boulders, usually it should not be done step by step, but a one-stop production and processing operation procedure of making models, remaking, transporting, processing, and installing. As long as the process is reasonable and the management personnel are in place, the work efficiency can be greatly improved and the construction period can be shortened.
There are very strict requirements on the foundation structure in the processing of landscape boulders. In the civil construction, the load bearing problem of stone art should be raised as soon as possible according to the plan, so as to do the preliminary work in the civil construction stage and provide the necessary support for the installation of landscape boulders. Basic conditions.
1. Transportation. Large-scale urban stone art has a large or even huge volume. In order to ensure the accuracy of the shape in the early processing stage, it must be completely released at one time. When the carbon steel plate is sealed, the entire stone art must be disassembled. In order to facilitate the transportation of landscape boulders, except for reasonably decomposed blocks, hoisting holes for hoisting should be welded on each disassembled body, which is convenient for hoisting and does not damage the stainless steel surface. The hoisting holes can be repaired after all installations are completed.
2. Installation. Installation is one of the most important links in the landscape boulders project. First of all, the foundation connection must meet the requirements, safety first, and the steel plate must be welded with the pre-embedded steel bar of the foundation, and poured with cement. When pouring cement, it is necessary to ensure that the contact surface between the cement and the steel plate is well cushioned. For example, holes can be drilled on the steel plate for secondary cement filling. During the installation and combination of landscape boulders blocks, the treatment of the patching boards during docking should be considered, because the patching boards will still be uneven during the welding process and inconsistent with the surrounding areas; in addition, the joints are not easy to pack. In addition to grinding, the treatment method can still be adjusted with simple tools such as pullers.
Contact Us

Author:

Mr. daimingda

Phone/WhatsApp:

+8619112186195

Popular Products
Industry News
You may also like
Related Categories

Email to this supplier

Subject:
Email:
Message:

Your message must be betwwen 20-8000 characters

Contact Us

Author:

Mr. daimingda

Phone/WhatsApp:

+8619112186195

Popular Products
Industry News
  • Send Inquiry

Copyright © 2024 The universe in the stone is great All rights reserved. Privacy Policy

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send